海考网>考生写作>应用文>合同>英文合同

英文合同

时间:2022-12-25 12:09:11 合同 我要投稿

有关英文合同三篇

  现今很多公民的维权意识在不断增强,能够利用到合同的场合越来越多,签订合同是为了保障双方的利益,避免不必要的争端。合同有不同的`类型,当然也有不同的目的,以下是小编为大家收集的英文合同3篇,希望对大家有所帮助。

有关英文合同三篇

英文合同 篇1

  Contract No.:________________________.

  Date of Signature:____________________.

  Place of Signature:____________________.

  This Contract is made and entered into through friendly negotiation by and between China____________________ (hereinafter referred to as “Client”), as one party, and____________________ (hereinafter referred to as“Consultant”),as the other party, concerning the technical consultancy service of__________, under the following terms and conditions:

  Article 1 Contents of Technical Consultancy Service

  1.1 Whereas Client desires to obtain the technical consultancy service of from Consultant and Consultant has agreed to perform such services.

  1.2 The Scope of Technical Services is defined in Appendix 1.

  1.3 The Time Schedule for the Services is shown in Appendix 2.

  1.4 The Manning Schedule is described in Appendix 3.

  1.5 Consultant shall complete the Services within__________months from the Effective Date of this Contract and furnish the final technical service report, including drawings, designing documents, all kinds of standards and photos, within____months. Consultant shall keep aware, free of charge, Client of the latest development of similar projects and any progress made in order to improve the designing of the project.

  Article 2 Both Parties' Responsibility and Liability

  2.1 Client shall furnish to Consultant the pertinent data, technical service reports, maps and information available to him and shall give to Consultant the reasonable assistance necessary for carrying out of his duties. Particularly Client shall nominate a general representative who shall be available at reasonable time.

  2.2 Client shall assist Consultant with the responsible authorities for obtaining visas, work permits and other documents required by Consultant to enter the country and to have access to the Site of the Project. The above expenses shall be borne by Consultant.

  2.3 Consultant shall furnish a sufficient number of competent personnel to perform its obligation hereunder, in addition to those personnel specifically listed in Appendix 3. All personnel employed by Consultant in carrying out the work shall be exclusively Consultant's responsibility, and Consultant shall hold Client harmless from any claims of any kind by Consultant's personnel arising out of any acts by Consultant or its personnel in connection with the work performed hereunder.

  2.4 Consultant shall provide Client all the technical technical service reports and relevant documentation within the Scope of Technical Services and within the Time Schedule of the Time Schedule for the Services.

  2.5 Consultant shall assist Client'S personnel in his country in obtaining visas and in arranging lodgings. Hotel and boarding expenses shall be borne by Client. Consultant shall supply to Client'S personnel office space and necessary facilities as well as transportation.

  2.6 Consultant shall be responsible for and shall indemnify Client and his employee in respect of injury to person or damage to property occurring in connection with the services, to the extent that such damage or injury directly results from negligence of Consultant's personnel while engaged in activities under this Contract.Consultant shall be liable only to the work under this Contract.

  2.7 Any and all liability of Consultant with respect to this Contract shall be limited to the Total Contract Price received by Consultant for his profession services and shall terminate upon expiration of the warranty period set forth in Article 7.3.

  Article 3 Price and Payment

  3.1 The total contract price is__________(say __________________only) in________(currency). The breakdown prices of the above mentioned total contract price are as follows:

  Contract Price for Item 1: ______(say ____________only) in________ (currency); Contract Price for Item 2: ______(say ____________only) in________ (currency); Contract Price for Item 3: ______(say ____________only) in________ (currency); Contract Price for Item 4: ______(say ____________only) in________ (currency).

  3.2 The total contract price will include all the service and technology provided by Consultant. The total contract price shall be firm and fixed and shall not fluctuate with any inflation. The total contract price shall include all charges and expenses incurred by Consultant in performing his obligations both in his own country and in the People's Republic of China and includes the expenses incurred in sending the Technical Documentation to Client's office by all kinds of forms.

  In the event of Force Majeure as defined in the Contract, the total contract price shall be readjusted through friendly negotiations between the parties. If Client requires services not contemplated in the Scope of Services the parties shall friendly discuss an amendment to the

  total contract price. Any such amendment shall be in writing countersigned by both parties. This document shall then form integral part of the Contract.

  3.3 All payments to be made by Client to Consultant under the present Contract shall be made by telegraphic transfer. In case of any payment by Client, the payment shall be effected through__________in China to _________ for the account of Consultant.

  In consideration for the services provided by Consultant hereunder, Client shall effect the payment to Consultant in accordance with the following manner and percentage:

  3.3.1 _______ percent (________ %) of the total contract price, i.e._____________ (Say: ________ only), shall be paid by Client to Consultant within ________ (____) days after the client has received the following documents provided by Consultant and found them in order.

  A. One (1) original and two (2) duplicate copies of Consultant's government approval, or a written statement of the competent authorities or relevant agency of Consultant's country certifying that such document is not required;

  B. One (1) original and one (1) duplicate copy of Irrevocable Letter of Guarantee for advance payment issued by Consultant's Bank in favor of Client covering_______(Say:________ only), specimen of which is as per Appendix 4;

  C. Five (5) copies of profoma invoice covering the total contract price;

  D. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

  E. Two (2) copies of sight draft.

  The said shall be delivered by Consultant not later than ____days after the effective date of the ________present Contract.

  3.3.2 ________percent (____%) of the Contract price for Item 1, i.e._________ (Say: __________ only) shall be paid by Client to Consultant within _____ (__) days after Consultant has received the following documents provided by Consultant and found them in order.

  A. Ten (10) copies of technical service report on Item 1;

  B. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

  C. Two (2) copies of sight draft.

  3.3.3 ________ percent (____%) of the Contract price for Item 2, i.e. ___________ (Say: ____________ only) shall be paid by Client to Consultant within ________ (___) days after Licensee has received the following documents provided by Consultant and found themin order.

  A. Ten (10) copies of technical service report on Item 1;

  B. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

  C. Two (2) copies of sight draft.

  3.3.4 ________percent (____%) of the Contract price for Item 3, i.e._________ (Say: __________ only) shall be paid by Client to Consultant within _____ (__) days after Consultant has received the following documents provided by Consultant and found them in order.

  A. Ten (10) copies of technical service report on Item 1;

  B. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

  C. Two (2) copies of sight draft.

  3.3.5 ________percent (____%) of the Contract price for Item 4, i.e._________ (Say: __________ only) shall be paid by Client to Consultant within _____ (__) days after Consultant has received the following documents provided by Consultant and found them in order.

  A. Ten (10) copies of technical service report on Item 1;

  B. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

  C. Two (2) copies of sight draft.

  3.3.6 ________percent (____%) of the Total Contract price , i.e._________ (Say: __________ only) shall be paid by Client to Consultant within _____ (__) days after Consultant has received the following documents provided by Consultant and found them in order.

  A. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

  B. Two (2) copies of sight draft.

  3.4 In case Consultant is liable for paying to Client the penalty under the Contract, Client shall have the right to deduct it from any said payment.

  3.5 The banking charges of both parties incurred in China for the execution of the Contract shall be borne by Client and those incurred outside China shall be borne by Consultant.

  Article 4 Delivery Schedule

  4.1 The deadline for the arrival of the Technical service reports CIF _____ are:

  A. Technical service report on Item 1 : _________months after effectiveness of the Contract;

  B. Technical service report on Item 2 : _________months after effectiveness of the Contract;

  C. Technical service report on Item 3 : _________months after effectiveness of the Contract;

  D. Technical service report on Item 4 : ________months after effectiveness of the Contract.

  4.2 Consultant will inform Client by Fax when the Technical service reports are airmailed to Client indicating the date and number of airway bill. Client will inform Consultant when the Technical service reports have been received.

  4.3 Should any document be missing or damaged during the transport Consultant shall be notified accordingly and within two (2) weeks the missing or damaged document shall be replaced by Consultant free of charge.

  Article 5 Confidentiality

  5.1 All data assembled, developed, compiled, reproduced, studied, and prepared in connection with the work done hereunder and furnished to Consultant by Client shall be considered confidential and shall not be divulged to any person, firm or corporation other than Client or its designated representatives. This Clause shall remain binding on Consultant notwithstanding the termination of the Contract for any reason.

  5.2 Within the validity period of Contract, Both parties shall take proper measures to keep the materials or information strictly confidential. The other party shall not disclose or divulge to any third party without prior written consent of one party.

  5.3 Either party shall be obliged to keep confidential any secret information of the other party which either party and its personnel may obtain or be accessible to in the course of the performance of Contract. Either party shall not make use of or disclose such secret information obtained from the other party without prior written permission issued by the other party.

  Article 6 Taxes and Duties

  6.1 All taxes and duties in connection with and in the execution of Contract levied by the Chinese government on Client in accordance with the tax laws of PRC shall be borne by Client.

  6.2 All taxes and duties levied by the Chinese government on Consultant, in connection with and in the execution of Contract, according to Chinese tax laws and the agreement between the government of PRC and the government of Consultant's country for the reciprocal avoidance of double taxation and the prevention of fiscal evasion with respect to taxes on income shall be borne by Consultant.

  Client is legally obliged to withhold, as a withholding agent, the amount of taxes pro rata each taxable payment under Contract and pay them to the relevant Chinese tax authorities. After receiving the tax receipts issued by the relevant Chinese tax authorities for the aforesaid withholding taxes, Client shall forward them to Consultant without undue delay.

  6.3 All taxes and duties arising outside PRC in connection with and in the execution of Contract shall be borne by Consultant.

  Article 7 Warranty

  7.1 Consultant warrants that he has the experience and capability to efficiently and expeditiously perform the services in a satisfactory manner and that the services performed by him under this Contract shall be performed by competent personnel in accordance with accepted standards.

  7.2 In the event of a failure of Consultant to provide to Client satisfactory services within the scope of work described in Appendix at any time for any reason within the control of the Consultant, Client may notify Consultant of such dissatisfaction. Consultant shall be afforded a period of days to correct or remedy the matter. Should Consultant within the time afforded by Client fail to correct or remedy the matter to the satisfaction of Client, all charges shall cease forthwith until such time as Consultant is able to provide satisfactory services in accordance with the Scope of work described in Appendix.

  7.3 Consultant guarantees to Client that he shall, after receipt of notice from Client, promptly correct at no cost any errors in the services arising out of the negligent performance thereof.

  Article 8 Ownership of Technical Service Reports

  8.1 Final version of the technical service report submitted to Client and all relevant data such as maps, plans and supporting material compiled in performing the Scope of Services, shall be the property of Client. Such materials shall be sorted and indexed by Consultant prior to transmission to Client.

  8.2 Consultant shall be permitted to retain copies thereof, provided however that such materials, including the material furnished by Client as stated in Article 5 of this Contract, shall not be used by Consultant for purposes not related with this Project without the prior written approval of Client.

  Article 9 Assignment

  9.1 Neither Client nor Consultant shall assign or sublet their rights or obligations hereunder without the prior written consent of the other party.

  Article 10 Termination

  10.1 If, due to the responsibility of Consultant, the technical service reports have not been delivered at dates according to the delivery schedules as stipulated in Article 4 of the Contract, Consultant shall be obliged to pay to Client penalty for such delay in delivery at the following rates:

  A. ______ percent (____%) of the total contract price per week for the first four weeks;

  B. _____ percent (____%) of the total contract price per week from the fifth week to the eighth week;

  C. ______ percent (____%) of the total contract price per week from the ninth week of delay.

  Odd days less than one (1) week shall be counted as one (1) week for calculating the liquidated damage.

  10.2 The total liquidated damage for late delivery shall not exceed ______ percent (____%) of the total contract price. Payment of the liquidated damage for late delivery shall not release

  Consultant from its obligation to deliver technical service reports.

  10.3 Client may, without prejudice to any other remedy for Consultant's following breach of Contract, terminate Contract in whole or in part by a written notice of default send to Consultant, if Consultant

  A. Fails to deliver any or all of technical service reports within______(____) days after the scheduled delivery date as specified in Article 1; or

  B. Fails to make the technical service reports meet the minimum level of Acceptance Standards as specified in Appendix 1.

  Consultant shall refund to Client all the payments effected by Client to Consultant plus an interest at the rate of______ percent (____%) per annum in case of such a termination.

  10.4 Either party may, without prejudice to any other remedy, terminate Contract in whole or in part by a written notice send to the other party, if the other party.

  A. fails to perform its confidentiality obligation under Contract; or

  B. fails to perform any other obligations under Contract except minor parts thereof, and does not remedy for its failure within a period of______ (____) days upon receipt of the written notice or a period agreed upon between the parties; or

  C. becomes bankrupt or insolvent; or

  D.Affected by any event of Force Majeure for more than ______ days.

  Article 11 Force Majeure

  11.1 Should either party be prevented from performing any of its obligations under Contract due to event of Force Majeure, such as war, serious fire, typhoon, earthquake, flood and any other events which could not be expected, avoided and overcome, the affected party shall notify the other party of its occurrence by fax and send by registered airmail a certificate issued by the competent authorities or agency within fourteen (14) days following its occurrence.

  11.2 The affected party shall not be liable for any delay or failure in performing any or all of its obligations due to the event of Force Majeure. However, the affected party shall inform the other party by fax the termination or elimination of the event of Force Majeure without delay.

  11.3 Both parties shall proceed with their obligations immediately after the cease of the event of Force Majeure or removal of the effects. The validity period of Contract and/or the scheduled period for relative execution of Contract shall be extended correspondingly.

  Article 12 Arbitration

  12.1 Any dispute arising from or in connection with this Contract shall be submitted to China International Economic and Trade Arbitration Commission,Shenzhen Commission for arbitration in accordance with the Commission's arbitration rules in effect at the time of applying for arbitration. The arbitral award is final and binding upon both parties and the applicable law is the material law of P.R.C.

  12.2 Notwithstanding any reference to arbitration, both Parties shall continue to perform their respective obligations under the Contract unless otherwise agreed.

  Article 13 Language and Standards

  13.1 Correspondance except this Contract between Client and Consultant, data and documents made available by Client to Consultant and the technical service reports and drawings prepared by Consultant shall be in the English language.

  13.2 Measures shall be written in the metric system.

  Article 14 Governing Law

  14.1 The construction, validity and performance of this Contract shall be governed by the laws of the People's Republic of China.

  Chapter 15 Effectiveness of the Contract and Miscellaneous

  15.1 Both parties shall make effort to obtain the approval from the respective authorities, if necessary, within thirty (30) days after Contract is signed by the authorized representatives of the two parties. Either Party shall notify in writing the other party of the approval date. The later date of approval shall be taken as the Date of Effectiveness of Contract.

  15.2 Contract shall be valid and remain in force for_______(____) years from the Date of Effectiveness.

  15.3 The outstanding credit and debt between the parties under Contract shall not be affected upon the termination or expiration of Contract.

  15.4 Appendices hereof shall be integral parts of Contract and have the same legal force as the text of Contract itself. The text of Contract shall prevail in case of any discrepancies between the text of Contract and Appendices.

  15.5 All amendments, supplements, subtractions, or alterations to Contract shall be made in writ

英文合同 篇2

  contract no.:

  the buyers: the sellers:

  this contract is made by and between the buyers and the sellers; whereby the buyers agree to buy and the sellers agree to sell the under-mentioned goods subject to the terms and conditions as stipulated hereinafter:

  (1)name of commodity:

  (2) quantity:

  (3) unit price:

  (4)total value:

  (5) packing:

  (6) country of origin :

  (7) terms of payment:

  (8) insurance:

  (9) time of shipment:

  (10) port of lading:

  (11) port of destination:

  (12)claims:

  within 45 days after the arrival of the goods at the destination, should the quality, specifications or quantity be found not in conformity with the stipulations of the contract except those claims for which the insurance company or the owners of the vessel are liable, the buyers shall, have the right on the strength of the inspection certificate issued by the c.c.i.c and the relative documents to claim for compensation to the sellers

  (13)force majeure :

  the sellers shall not be held responsible for the delay in shipment or non-deli-very of the goods due to force majeure, which might occur during the process of manufacturing or in the course of loading or transit. the sellers shall advise the buyers immediately of the occurrence mentioned above the within fourteen days there after . the sellers shall send by airmail to the buyers for their acceptancea certificate of the accident. under such circumstances the sellers, however, are still under the obligation to take all necessary measures to hasten the deliveryof the goods.

  (14)arbitration :

  all disputes in connection with the execution of this contract shall be settled friendly through negotiation. in case no settlement can be reached, the case then may be submitted for arbitration to the arbitration commission of the china council for the promotion of international trade in accordance with the provisional rules of procedure promulgated by the said arbitration commission . the arbitration committee shall be final and binding upon both parties. and the arbitration fee shall be borne by the losing parties.

  (the buyers) (the sellers)

英文合同 篇3

  The buyer: the seller: ____________ ____________

  Address: Address: ____________ ____________

  Tel: ____________ Tel: ____________

  Fax: Fax: ____________ ____________

  Contact: Contact: ____________ ____________

  The sale of the friendly negotiation of both parties, the buyer seller commissioned processing production ________ mould Co ______ set. The two sides reached the following processing agreement

  Basic mould of die:

  Product name serial number part name point number (mold type) mold single price (RMB yuan) delivery condition

  Total price: (including 17% VAT)

  The above set of mould material: _____________________

  (the above mold materials are provided by the seller).

  I. The rights and responsibilities of the two parties:

  Buyer's responsibility and rights are as follows:

  1. the buyer is responsible for the delivery of the R & D requirements and plans of the seller's project, and provides the sales forecast as far as possible.

  2. the buyer is responsible for the delivery of the product design drawings and other related technical information required by the seller to the seller and the technical support.

  3., the buyer has the sole right to interpret the product design drawings and related technical data delivered to the seller. When there is ambiguity, the Seller shall consult the buyer's opinion and confirm it by the buyer.

  4. after the seller completes the design and manufacture of the mould, the buyer will go to the seller's site to verify the mold, or to provide the product sample to the buyer for confirmation and confirmation by the seller. The moulds referred to in this contract include the mould of the product itself and the fixture and mould needed for the subsequent production.

  The rights and responsibilities of the seller are as follows:

  1. the seller is responsible for the design and manufacture of the moulds according to the product design drawings and other related technical information provided by the buyer.

  Be responsible for completing the mold according to the buyer's design requirements in accordance with the stipulations of the contract.

  2. the Seller shall be responsible for providing timely certification and sample test, trial production of desired products. At the same time the seller must provide the details of the related products.

  The detailed test report is for the buyer's confirmation. In case of repair / modification, the test report is also attached at the same time.

  The buyer does not bear any responsibility.

  1.5 the Seller shall give the buyer the corresponding compensation in the form of the buyer's approval as the seller causes the buyer to spend the labor and cost outside the normal technical support as a result of the seller's cause.

  2. the progress of the model:

  2.1 the seller after the receipt of the buyer after the confirmation of product drawing, which began to enter the mold design and production stage, open cycle for ________ days

  2.2 due to buyer's cause the delay of mold making progress is not calculated.

  2.3 if the seller's mold making process and other mistakes lead to the failure of the mold to be accepted and the buyer is in urgent need of production.

  At the same time, the production should be arranged with the existing mold, and the die should be reopened according to the requirements of the drawings and samples.

  3. mode of payment:

  Party B agrees that Party A will pay the payment as follows.

  3.1 separate settlement: Monthly knot, 60 days after the opening of the ticket, open 17% VAT invoices.

  3.1.1 of the total amount of the contract manufacturing batch mould (including VAT) for RMB _________ yuan (RMB ________ yuan), the buyer to pay the total amount of _____% mold, mold ___% residual cost allocation in the first 50K products, if the number of orders less than 50K, the buyer shall supply the seller after the unamortized tooling cost.

  3.1.2 from the two sides after the signing of the contract, the seller to provide value-added tax invoices (mold total ____%), the buyer within twenty working days of payment.

  4. product order: only after the quality acceptance of the product sample is qualified and the buyer's written confirmation, the seller may accept the order of the third party authorized by the buyer or the buyer. The order contract signed by third parties authorized by the buyer with the buyer's seller is subject to this contract.

  Four, product quality assurance

  After the seller has completed the mold, the Seller agrees to guarantee the quality of the product in accordance with the buyer's quality standard (the first confirmation report).

  The buyer reserves the right to modify the content of the quality standard in accordance with the actual needs.

  Five. The ownership of the mold

  1. the ownership of all moulds and clamping fixtures and their assembly drawings and parts drawings (including 2D and 3D) involved in the contract shall be owned by the buyer, and the Seller shall not interfere with the buyer's disposition of the molds. If the seller is responsible for the custody of the seller, the Seller shall not supply the mould to the third party without the buyer's consent, otherwise the buyer shall have the right to ask the seller to return the mold fee and compensate for the loss.

  2. when the buyer pays the mold cost, the seller must cooperate with the buyer or the third party designated by the buyer to transfer the inspection and accept the replacement of the die from the seller's place, and will replace the worn parts at the expense of itself, so as to ensure the restart of production. The seller is obliged to assemble, rust and pack the moulds and send it to the place designated by the buyer. All mold assembly drawings and part drawings (including 2D and 3D) and all clamping devices must be transferred to the buyer at the same time.

  3., during the process of mold transfer, such as the improper assembly, rust prevention or packaging of the seller, it will cause damage to the mold, and all direct and indirect losses arising therefrom shall be borne by the seller.

  Six, mold maintenance

  1., the Seller guarantees the service life of the mould 500 thousand times, and the seller is responsible for free maintenance during this period. If the mold is not used during the service life, the Seller shall be responsible for changing or re opening the mold and taking the corresponding cost.

  2. the seller should die changes, maintenance and repairs in a timely manner and register, whether such a modification, maintenance and repair are

  The buyer made it. If the buyer is to ask the relevant technical details or evidence, the buyer may register with the time without notice. The Seller shall give the buyer a copy of the record once every three months. The seller should take the initiative to complete this task on a regular basis without the buyer's request.

  Six. Intellectual property rights

  The product and the buyer 1. involved in this contract to provide design drawings and other information in the intellectual property is owned by the buyer, the buyer without permission, the Seller shall not disclose to any company or individual, otherwise all the losses resulting from the seller; the buyer only agreed to all data and information provided by the seller by the buyer the purpose of this contract based on the,

  2. the Seller agrees to the design drawings will not be provided by the buyer and other data or information for the purpose of non contract other than the seller or the buyer has the right to pursue responsibility; without written permission from the buyer, the Seller shall not in publications, advertising or other written and oral form to the seller to provide or have provided any data and information.

  3., without the buyer's license, it is strictly prohibited for the seller to use this mould to supply other customers other than the buyer or the buyer's designated customer, otherwise all direct and indirect losses arising from it shall be the seller's responsibility.

  4. other undisclosed matters of confidentiality are carried out in accordance with the "confidentiality agreement" signed by the buyer and the seller.

  Seven. Liability for breach of contract

  1. the Seller shall be liable for breach of contract if the seller fails to complete the mold making and sample delivery according to the progress of each stage specified in the 2.1. The Seller shall pay the buyer a fine of 2% of the total amount of this contract at a time of one day of delay. The amount of the penalty is not more than the total amount of the contract.

  2., if the seller's cause causes the seller's quality to be supplied to the buyer can't meet the buyer's requirements, and the other materials will be lost and scrapped during the assembly process, the seller will fully compensate for the loss and scrap materials and the resulting artificial / stop line costs. The two parties may sign separately the raw material for production.

  3. the quality and progress of the product provided to the buyer by the seller for the seller's cause can not reach the buyer.

  Place)

  3. when the mold is certified by the buyer, the seller is responsible for the seal of the mold. If the buyer agrees that the seller is responsible for the subsequent processing and production of the products, the Seller shall be responsible for the repair and maintenance of the moulds, and the Seller shall make the batch production according to the order of the third party authorized by the buyer or the buyer.

  4. for all the molds produced by the buyer, the Seller shall provide the buyer with detailed design drawings. All drawings must be made in AutoCAD or pro-eng (pro-el2) and must be transmitted to the buyer in electronic form before the mold opening for approval.

  Two. Technical terms:

  1. repair and maintenance of the mold: the seller is responsible for the repair and maintenance of the mold during the production process.

  2., after no dispute between the two sides, the buyer will provide the product design drawings and related technical information to the seller, and send the engineer to the seller's technical exchange or the seller send the engineer to the buyer for technical communication. The product drawings and technical requirements list is attached to Annex 1.

  3. the seller promised to use the quality requirements of the mold for the system to produce products to the buyer

  4. the seller promised to use the mold for the system to produce the product can reach the seller's delivery capacity:

  Nissan energy: _______k, monthly capacity: ______k

  5. the seller promises that all the moulds involved in this contract can be reached to 400 thousand times.

  6., without the buyer's permission, it is strictly prohibited for the seller to contract the whole part of the contract involved in the contract to other companies for processing. Otherwise, the Seller shall be liable for breach of contract in accordance with the breach clause of the contract as a breach of contract.

  Three. The terms of business:

  1. mold price:

  1.1 after negotiation between the two parties, the seller will provide the final offer of the mould approved by the buyer and sign the price confirmation as an indispensable part of the contract.

  The total amount of 1.2 contract (including VAT mold ____%) rmb_______.

  1.3 the total cost of the price of the mold contains the following expenses, and the Seller shall not ask the buyer for the following reasons:

  1.3.1 the cost of all the fixtures and tools required by the seller for the molding / two processing / assembly of the product;

  1.3.2 the seller, according to the contract, carries out the cost of material, equipment and manpower for mould design, test mould.

  1.3.3 the cost of the sample (800 sets) provided by the seller to the buyer for the certification of the mold and product;

  1.3.4 the seller is the cost of the die vulnerable spare parts to ensure the normal production of the mold;

  1.3.5 the cost of the related tools and tools for other processes that are prepared for the normal production of the product.

  1.4 when the written request of the buyer the seller according to the change of the product design for the mould modification, if the mould modification is relatively simple, including less mold material changes and other simple changes from the mold, the seller to the buyer without charges; if the modification is complex, great influence on the whole structure of the mold, then the seller according to the modified working hours for mold to the buyer by the buyer offer, the corresponding mold modification cost. The buyer shall not bear any responsibility for the repair or modification of the mold due to the seller's reason, due to the failure of the mold to meet the buyer's requirements.

  1.5 by the seller to the buyer's manual and cost technical support from the normal cost, the Seller shall give the buyer recognized the way the corresponding compensation.

  2. the progress of the model:

  2.1 after the seller has received the product drawing file after the buyer's confirmation, that is,

  The cost of artificial / stop line formation. The two parties may sign separately the raw material for production.

  3. if the seller has caused the seller to the buyer of the product quality and schedule is not up to the requirements of the buyer, the buyer and customer missed the best time to market, or the buyer was forced to cancel the project, so that the buyer and its customers suffer serious losses and loss of material research, in addition to the seller to refund all previous the buyer to pay the purchase price, depending on the actual situation of the seller also bear the buyer direct and indirect economic losses.

  4., if the seller is unable to resist force, including the war, fire, strike, and other force majeure caused by Chinese law, the buyer will allow the buyer to dismiss it. The Seller shall notify the buyer in written form within 24 hours after the occurrence of the force majeure, and the seller is obliged to take all necessary measures to deliver the goods as soon as possible. If the force majeure continues for more than 2 weeks, the buyer has the right to cancel this contract.

  5. other unfinished matters: implemented in accordance with the economic contract law.

  Eight. Dispute settlement

  Any dispute arising from the execution of this contract shall be settled through friendly negotiation first. If no negotiation can be reached within 30 days, either party can submit the dispute to the municipal court.

  The parties to this contract shall be strictly enforced. If one party fails to perform the contract in the cause of the contract, the party must ask for the consent of the other party two weeks in advance, and the contract shall be terminated.

  The buyer: the seller: ____________ ____________

  Representative: Representative: ___________ ____________

【有关英文合同三篇】相关文章:

有关英文求职信4篇05-21

有关英文求职信四篇04-19

有关销售英文求职信3篇09-05

有关装潢合同01-04

有关供货合同01-04

有关借贷合同01-02

有关租车合同12-30

有关土地租赁合同12-29

有关英文版求职信范文十篇03-03

英文说课稿11-06